MSBA Board Votes to Move Thurgood Marshall Middle School in Lynn into Schematic Design Phase
ol127.mail.live.com/default.aspx?id=64855The Schematic Design phase will look at possible options for the replacement of the school with a new facility on the site of the current school building.
Rick Starbard
I don't know why they would have written that. The schematic design offered was the Brookline site following the unanimous votes of the School Committee and the Council following public presentations and comments which eliminated the Porter St. and Adams St. Extension sites which, if I remember correctly took place in the latter part of 2012. These votes are what precipitated the eminent domain taking.
I'm curious what MSBA recommendation is today, considering the cost has increased beyond the other options.
ReplyDeleteProbably the same because they demanded an independant cost estimate and then a reconciliation between the two until they came to with in 1% of each other. That being said I am not sure of the pathway they used to arrive at similar numbers.
Delete